Challenges
Datasets
Workspaces
Papers
Discussions
Leaderboard
Log inSign up
Challenges
Datasets
Workspaces
Papers
Discussions
Leaderboard
Blog
Job Board
Q3AS

© 2026 Aqora Quantum S.A.S.

TermsPrivacyLegal Notice

EEDT: Measurement-Gated Quantum Error Correction for NISQ Calibration Drift

Takeshi Okuda

Published Feb 28, 2026• 0 citations
Publisher

Abstract

Version 10 (November 2026) — corrections to v9. The v8 hardware result (ibm_marrakesh Q6–Q7) remains unconfirmed, but the reason is restated. v9 said that later runs of the same protocol family did not reproduce it; those runs (GPS v3–v6) used a different protocol without post-selection. v10 instead states: the correction angles in the v8 run were at most 0.02 rad (νZZ = 0.13 kHz, 30 µs wait), which can change the fidelity by at most ≈0.01. The reported gains (up to +0.112, σ ≈ 0.02–0.04 from ≈80–400 post-selected shots per setting) therefore cannot be attributed to the correction and are consistent with statistical fluctuation. No direct replication with the same post-selected protocol was performed. Section 4.4, Fig. 2, Table 3, the device-compatibility paragraph and the conclusion are updated accordingly. Earlier changes (v9, retained): the Nmeas = 8 gain (+0.112, z = 2.7) does not pass Bonferroni correction over the 8 tested settings; the a-priori region contains five settings, and Holm over these leaves Nmeas = 2 and 8; the convergence proposition bounds the post-selected fidelity but does not predict the gain; MCM dead-time explains only part of the theory–experiment gap.

DOI
10.5281/zenodo.18809138

Related papers

EEDT: Entanglement-Enhanced Dynamical Tracking for ZZ-Coupled Superconducting Qubits

Takeshi Okuda

Version 6.2 (November 2026) — corrections to V6.1. Main result restated. GPS = +0.037 ± 0.011 (z = 3.35) at τ = 30 µs, N = 1; 8 of 10 conditions significant after Holm correction; Stouffer z = 7.3 over all 10 (independence assumed). This is kept as a statistically significant difference between the MCM-conditioned feedforward circuit and the reference circuit. Its attribution to ZZ-phase correction is not established: the correction parameter νZZ = 3.6 kHz came from a detuned single-quadrature Ramsey fit (2026-03-01), a method later found to overestimate νZZ by ≈3×; the same pair measured with the same method on 2026-03-06 gave 0.06 kHz; and no MCM-only control was run. 2026-03-15 follow-up withdrawn as evidence. In all follow-up scripts the delay was applied only to the ancilla in the feedforward circuit and only to the target in the reference circuits. The reference fidelity therefore traces the target's own Ramsey fringe (0.97 → 0.12 over 5–70 µs) while the feedforward circuit stays at 0.8–0.99, and the reported +0.726 (z = 66) exceeds the ≈0.21 maximum that a conditional Rz(0.873) can produce. The apparent optimum at 50 µs, the ref0 comparison and the T2 discussion are affected in the same way. In a same-job IQM control (2026-03-17), the gain from the same asymmetry (+0.19 to +0.24) vanished when the delay was applied to the target in both circuits (+0.105, +0.030, −0.016). Model statements (τ* formula, predicted gain curve, stochastic-timing regime) are marked as model predictions not confirmed by the data; leftover "8.5σ" and "<5% agreement" in the conclusion corrected. Files: EEDT_paper_v6_2.pdf / .tex and README_v6_2.md replace the V6.1 paper files and README; other scripts and figures unchanged.

•Mar 3, 2026•1 citation

[WITHDRAWN] Phase-Invariant Condition for Optimal Feedforward in ZZ-Coupled Quantum Systems: Experimental Validation on IBM Heron r2 and IQM Garnet

Takeshi Okuda

WITHDRAWN (v1.2, November 2026; notice revised from v1.1). The main claim of this preprint — that πνZZτ* ≈ 0.873 rad is an observed cross-platform invariant and the optimal feedforward condition — is withdrawn. Origin of 0.873. The value comes from the best of three delays (30/50/70 µs) in a single 2026-03-15 run on ibm_marrakesh Q94–Q95, in which the feedforward circuit applied the delay only to the ancilla and the reference circuits only to the target; the apparent optimum followed the target's own Ramsey fringe and is not a feedforward result. The value was then fixed as an input. No independent test. In all later IBM runs the delay was set to τ = 0.873/(πνZZ), so the constancy holds by construction. A measurement of the optimum without 0.873 as an input was planned but not performed. νZZ values came from a detuned single-quadrature Ramsey fit later found to overestimate νZZ by ≈3× and to lose its sign. Measured quantity. The IBM values in Table 1 come from a circuit with a conditional X (not Rz), so φff does not enter; the reported GPS is Fff − Fstatic, not Pff − Pref as defined. The IQM scan and the circuit of Appendix B apply Rz before a Z-basis measurement, for which the ideal response is zero (cf. 10.5281/zenodo.20961679, Sec. 4.1). IQM. The 18 values in the archived scan files give GPS(τ = 7 µs) = −0.006 ± 0.007; the tabulated +0.026 ± 0.011 (n = 5) could not be reproduced, and no n = 29 data set was found. Operational note. Setting τ = 0.873/(πνZZ) on IBM Heron r2 gave GPS > 0 on most pairs tried; 0.873 rad is retained only as an empirical operating setting, not as an optimum or a constant. The derivation φ*ff = arg⟨eiφ⟩ is unaffected. The PDF contains this notice followed by the original text unchanged.

•Apr 15, 2026•0 citations

[Withdrawn] When the reference is not the signal: state-dependent damping and a pre-flight test for error mitigation of collective observables

Daniel Leonforte

Withdrawn (version 2, 2026-11-06). The central claim of version 1 does not hold. A control run with a fixed qubit layout shows no state dependence of the damping, and the 465-gate failures do not test the transfer assumption. A two-page withdrawal notice precedes the unchanged original text in the PDF; the conclusions of version 1 should not be used. Control run FS40. The same three 161-gate circuits as in version 1 (identical angles) were transpiled once with a common initial layout and a fixed transpiler seed; the two-qubit gate sequence is identical for all angles, and layout and gate hash are stored with the data. On ibm_marrakesh (one job, five circuits, two repeats, 32,768 shots each) the raw ⟨K²⟩ values are 157.15, 158.63 and 158.41 (±0.65); the largest violation of the affine transfer bound is 0.5σ, against up to 13σ in July. The July effect does not recur. Most likely cause: in July the circuits were transpiled separately without a fixed layout or seed, and the layouts were not recorded. 465-gate failures. In all seven cross-validations calibration and target circuits differ in depth (140–300 two-qubit gates), so the failures show only that a per-gate extrapolation between differently routed circuits fails. The only structurally identical repeat at 465 gates agrees (107.50 ± 2.10 vs. 107.12 ± 2.17). What remains is standard practice, not a new result: fix and record layout and seed in any transfer test, and use calibration and target circuits of equal depth and routing. FS40 code and data: fs40_control_run_data_2026-11-06.zip (this record). Original data set: doi:10.5281/zenodo.22953020. Original abstract of version 1 (withdrawn): On a superconducting processor, the damping that reference-based error mitigation must carry from a reference circuit to a signal circuit is not a property of the circuit: at identical depth, routing and gate content, changing only a rotation angle moves it by twenty to thirty standard deviations (χ²/dof = 116), while three repetitions of one and the same circuit agree within shot noise (1.5). The transfer assumption behind most mitigation schemes is seldom testable, because the exact answer on the signal circuit is usually unknown. Here it is known on every circuit. The observable is collective, ⟨K²⟩ of a 24-qubit nuclear shell-model state on ibm_marrakesh, read inside a postselected symmetry sector. At 161 two-qubit gates it is reconstructed to about one unit. At 465 gates two independent corrections fail: a mixture estimator with an in-situ calibrated false-positive kernel loses identifiability, and an operator-level renormalization without any shape model misses the known values by −69 to +283 units. From this diagnosis follows a pre-flight test, costing about ten seconds of processor time, that decides before a production run whether reference-based mitigation can work for a given observable and depth.

•Oct 30, 2026•0 citations

Per-channel and cross-channel defects in Hadamard-measurement randomness on IBM Heron processors: a multi-session study with held-out channel selection

PJ Horelican

Preparing every qubit of a superconducting processor in an equal superposition and measuring it is the simplest way to draw random bits from a cloud quantum computer, and its output is known to be biased. We quantify how much min-entropy is lost, where it is lost, and how well the loss can be predicted, using 1,974,848 Hadamard-circuit shots and 331,072 control shots from 15 sessions on three 156-qubit IBM Heron processors (ibm_fez, ibm_kingston, ibm_marrakesh), recorded between April and October 2026. Measured with the most-common-value estimator of NIST SP 800-90B against the expectation for an ideal source, the deficit is 2.47–5.94 bits per 127-bit word in the October sessions and 8.71 bits per 156-bit word in a one-million-shot run, and five channels carry 19–39% of it. Readout asymmetry measured in the same job explains 0.92 of the variance of the per-channel bias in that run, but the calibration data published with the device is an erratic predictor (Spearman 0.01–0.58 between |bias| and reported readout error) and occasionally predicts the wrong sign. The bias profile is reproducible over minutes, but its Pearson correlation drops to 0.10–0.22 within 12–27 hours. Excluding the channels that are most biased in a single 32,768-shot pilot job removes 27–53% of the deficit on held-out data when ten channels are dropped, within 0.40 bits of an oracle and at least as good as calibration-based exclusion in 138 of 140 comparisons, while a list taken hours earlier loses most of that benefit. Finally, the most consistent defect over six months is invisible to any per-channel test: two coupled qubits of ibm_marrakesh produce anticorrelated outcomes (r = −0.29 to −0.56) in every session we recorded on that device. We conclude that randomness drawn from such devices needs per-session, data-driven channel selection and pairwise as well as per-channel monitoring, and that none of these statistical checks certifies quantum origin.

•Nov 20, 2026•0 citations

Quantum Temporal Reversal Learning: Forward-Reverse Circuit Fidelity as an Adaptive Learning Rate Signal with Hardware Validation on Trapped-Ion QPU

Sharaf Samiur Rahman

v10 (20 April 2026): Added VQE H₂ simulator results (qtrls_vqe_h2_results.json). QTRLS applied to H₂ ground state energy minimisation (STO-3G basis, 4 qubits). 20/20 trials converged. Mean final energy −1.8478 Hartree against exact −1.8572 Hartree. F_R coupling confirmed. v9 (18 April 2026): Added 8-qubit multi-trial hardware validation results. 5 independent trials on IonQ Forte QPU. Mean F_R = 0.8538 ± 0.0099, range [0.8360, 0.8642]. Confirms reproducibility of F_R signal at 8-qubit scale. Single-trial reference F_R = 0.8671 is within one standard deviation of multi-trial mean. Trial job IDs: Trial 1: fwd 966fa5b2-3b05-11f1-bd96-96a58bb47abc, rev 985cf99c-3b05-11f1-bd96-96a58bb47abc, F_R = 0.8618 Trial 2: fwd 3b93178a-3b07-11f1-bd96-96a58bb47abc, rev 3cbc3722-3b07-11f1-bd96-96a58bb47abc, F_R = 0.8539 Trial 3: fwd 966aad70-3b08-11f1-bd96-96a58bb47abc, rev 97d35658-3b08-11f1-bd96-96a58bb47abc, F_R = 0.8529 Trial 4: fwd 81bd4198-3b09-11f1-bd96-96a58bb47abc, rev 83143c90-3b09-11f1-bd96-96a58bb47abc, F_R = 0.8360 Trial 5: fwd 6e5128e4-3b0a-11f1-bd96-96a58bb47abc, rev 6f92a930-3b0a-11f1-bd96-96a58bb47abc, F_R = 0.8642 v8 (18 April 2026): Added 8-qubit hardware validation results. Paper submitted to npj Quantum Information on 18 April 2026 (submission ID: 253a94b1-2733-475e-a1f1-16c06d506b40). 8-Qubit Hardware Validation (18 April 2026) Single-trial 8-qubit F_R measurement on IonQ Forte QPU (ionq.qpu.forte-1) via Azure Quantum. 1000 shots each. F_R estimated via Bhattacharyya coefficient between forward and reverse measurement distributions. Hardware F_R = 0.8671 vs simulator baseline mean of 0.9179 (50 trials). Confirms F_R coupling is measurable at 8-qubit scale on real hardware. Verifiable job provenance: Forward job ID: 4d81dfb8-3ade-11f1-9c84-96a58bb47abc Reverse job ID: 4ec4764c-3ade-11f1-9c84-96a58bb47abc Target: ionq.qpu.forte-1 Workspace: sharaf-hw4 (Azure Quantum, East US) Date: 18 April 2026 4-Qubit Hardware Validation (18 April 2026) Single-trial and 5-trial validation on IonQ Forte QPU via Azure Quantum. 1000 shots each. Hardware F_R = 0.9945 (single trial), 0.9949 ± 0.0016 (5-trial mean). Simulator baseline mean F_R = 0.9508 (50 trials). Verifiable job provenance: Forward job ID: 5c4dc0da-3ac9-11f1-a37c-96a58bb47abc Reverse job ID: 5d6bb990-3ac9-11f1-a37c-96a58bb47abc Target: ionq.qpu.forte-1 Workspace: sharaf-hw4 (Azure Quantum, East US) Date: 18 April 2026 Raw results: qtrls_hardware_result.json, qtrls_hardware_multitrials.json, qtrls_hardware_8q.json, qtrls_hardware_8q_multitrials_v2.json, qtrls_vqe_h2_results.json Simulator Validation (17–18 April 2026) 150/150 trials converged across 4, 8, and 16 qubit scales. All gradients computed via parameter shift rule on real quantum circuits (v3 correction, 17 April 2026). 4-qubit: 50/50 convergence, mean final F_R = 0.9508 ± 0.0080, mean convergence iteration 123.8 8-qubit: 50/50 convergence, mean final F_R = 0.9179 ± 0.0022, mean convergence iteration 30.8 16-qubit: 50/50 convergence, mean final F_R = 0.7924 ± 0.0143, mean convergence iteration 37.8 Full scaling law confirmed across all three qubit scales. Version History v10 — 20 April 2026: VQE H₂ simulator results added. 20/20 convergence. Mean final energy −1.8478 Hartree. v9 — 18 April 2026: 8-qubit multi-trial hardware results added. 5 trials, mean F_R = 0.8538 ± 0.0099. v8 — 18 April 2026: 8-qubit single-trial hardware results added. Paper submitted to npj Quantum Information. v7 — 18 April 2026: 4-qubit hardware validation on IonQ Forte. Single-trial F_R = 0.9945. Job IDs included. v6 — 18 April 2026: 16-qubit scaling validation complete. 50/50 convergence. Mean F_R = 0.7924. 150/150 total trials converged. v5 — 17 April 2026: 8-qubit scaling validation. 50/50 convergence. Mean F_R = 0.9179. Mean convergence iteration 30.8. v4 — 17 April 2026: 50-trial 4-qubit independent validation. 100% convergence. Mean F_R = 0.9508. v3.1 — 17 April 2026: Implementation details removed from correction notice for confidentiality. v3 — 17 April 2026: Critical implementation error in v2 corrected. All results from v3 onward are valid. v2 — 17 April 2026: First simulation validation results. 50 independent runs, 100% convergence above F_R 0.85. v1 — 13 April 2026: Initial deposit. Patent GB2608473.1 filed. Code available on request. Patent GB2608473.1 (filed 13 April 2026). All hardware results are publicly verifiable via Azure Quantum job IDs.

•Apr 13, 2026•0 citations

The Instrument Diagnoses the Device: An Interior Audit on Superconducting Hardware

Ryan Cardwell, Claude

Version 3 (2026-08-25). Two attribution repairs against the archived analysis log, no measured number changed; carried as a dated in-body correction record. (i) v2's abstract and finding section attached "z = +7.1" to the cross-context identity itself. The identity's own maxima are z = +5.3 statistical (+4.7 with the model systematic), and the +7.1 values are det M* residual rows sitting ABOVE prediction -- more positivity margin, not the identity firing. The noise-model condition's failure "at z up to +7.1" remains correct as stated, since that pre-committed condition spans the full residual suite. (ii) v2 called the 0.038-0.058 band "radians"; those are the unharmonized-control expectation values, and the harmonized extractor's phase magnitudes ran 0.025-0.036 radians, shrinking about 32 percent between sessions -- both columns are now named. One verdict-vocabulary note for readers of the pre-registration files: session two's formal pre-committed outcome was the PARTIAL row (multiple mechanisms; DD next window), and mechanism language elsewhere in the note should be read at that grade. Version 2 (2026-08-21). REFRAMED FOR DEVICE-CHARACTERIZATION READERS. No measurement changes; the numbers, sessions, and ledger are identical to v1. What changed and why. v1 was written as a hardware companion to a quantum-foundations paper, and its first line asked the reader to care about an interior Born audit. The device result inside it does not depend on that framing at all: it is a diagnostic technique and a measurement, both usable by anyone characterizing a superconducting processor. v2 leads with them. The technique: a CROSS-CONTEXT CONSISTENCY IDENTITY -- an overdetermination surplus among tomographic reconstructions taken under measurement contexts whose transpiled SCHEDULES differ -- detects coherent, schedule-accumulated crosstalk that per-gate, per-qubit noise models are structurally blind to, and separates it from readout error using data already in hand, with no additional circuits. A new self-contained section states the four-step protocol (detect against a calibrated-simulator floor, discriminate coherent from readout by which residual fires, localize with zero-write baselines, confirm by schedule harmonization) together with its limitation: it sees only what makes contexts disagree, so an error common to all contexts is invisible and the remedy there is deliberate de-harmonization. The measurement, on ibm_kingston (Heron-class): the cross-context identity fired at up to z = +5.3 over a calibrated noisy-simulator floor (+4.7 with the model systematic; residual z-scores elsewhere in the estimator suite reach +7.1, on det M* rows sitting above prediction) while every readout monitor stayed clean; zero-write baselines localized the cause to the single coupler (24,23) as a few-kilohertz coherent residual ZZ producing a 5.8 percent spurious quadrature polarization on one memory qubit and absent on the neighbouring coupler (24,25); a pre-registered harmonization experiment collapsed the identity residual five-fold onto its floor, converting the violation into a measurable gauge; and a tracker bounded the crosstalk phase's coherence time to between roughly three and sixty minutes WITHIN a single calibration epoch, with a 6.3 sigma sign reversal at about 60-minute lag, falsifying the authors' own first attribution to daily recalibration. Total cost 554 seconds of public free-tier processor time. Also corrected in v2: the significance of the withheld estimate is now stated. The conditional Born-deviation bound was not issued because a pre-committed noise-model condition failed. The deviation-shaped number that the falsified model produces, quarantined in the ledger, is -0.203 +- 0.094 at 95 percent, which implies a standard error of 0.048 and places it 4.2 SIGMA FROM ZERO. v1 reported the number but not its size. A 4.2 sigma deviation-shaped result is not a marginal hint; it is the size of thing that gets published as a signal, and it was withheld because a gate stated in advance fired when firing was expensive. Hardware companion to "Gleason from Inside". Three sessions on ibm_kingston (554 of 600 free-tier seconds): the interior Born audit ran end to end, self-calibrated, certified positivity live at the lattice boundary, and kept its readout thermometer clean (claim A); the quantitative Born bound was not issued, exactly as pre-committed, because its noise-model condition failed; and that failure is the finding: schedule-accumulated coherent crosstalk on one coupler, detected by the cross-context identity, localized by zero-write baselines, converted into a gauge by schedule harmonization (five-fold collapse of the violation), and tracked in time (the phase flips sign within a single calibration epoch; coherence time 3 to 60 minutes; our own recalibration attribution falsified and corrected). Detect, localize, discriminate, track, on 9.2 minutes of free-tier time. The discipline (hash-frozen analysis, pre-committed outcome tables, credential lint extended from topology into time) is documented as a result in itself.

•Aug 19, 2026•0 citations
Version 10 (November 2026) — corrections to v9. The v8 hardware result (ibm_marrakesh Q6–Q7) remains unconfirmed, but the reason is restated. v9 said that later runs of the same protocol family did not reproduce it; those runs (GPS v3–v6) used a different protocol without post-selection. v10 instead states: the correction angles in the v8 run were at most 0.02 rad (νZZ = 0.13 kHz, 30 µs wait), which can change the fidelity by at most ≈0.01. The reported gains (up to +0.112, σ ≈ 0.02–0.04 from ≈80–400 post-selected shots per setting) therefore cannot be attributed to the correction and are consistent with statistical fluctuation. No direct replication with the same post-selected protocol was performed. Section 4.4, Fig. 2, Table 3, the device-compatibility paragraph and the conclusion are updated accordingly. Earlier changes (v9, retained): the Nmeas = 8 gain (+0.112, z = 2.7) does not pass Bonferroni correction over the 8 tested settings; the a-priori region contains five settings, and Holm over these leaves Nmeas = 2 and 8; the convergence proposition bounds the post-selected fidelity but does not predict the gain; MCM dead-time explains only part of the theory–experiment gap.
Version 6.2 (November 2026) — corrections to V6.1. Main result restated. GPS = +0.037 ± 0.011 (z = 3.35) at τ = 30 µs, N = 1; 8 of 10 conditions significant after Holm correction; Stouffer z = 7.3 over all 10 (independence assumed). This is kept as a statistically significant difference between the MCM-conditioned feedforward circuit and the reference circuit. Its attribution to ZZ-phase correction is not established: the correction parameter νZZ = 3.6 kHz came from a detuned single-quadrature Ramsey fit (2026-03-01), a method later found to overestimate νZZ by ≈3×; the same pair measured with the same method on 2026-03-06 gave 0.06 kHz; and no MCM-only control was run. 2026-03-15 follow-up withdrawn as evidence. In all follow-up scripts the delay was applied only to the ancilla in the feedforward circuit and only to the target in the reference circuits. The reference fidelity therefore traces the target's own Ramsey fringe (0.97 → 0.12 over 5–70 µs) while the feedforward circuit stays at 0.8–0.99, and the reported +0.726 (z = 66) exceeds the ≈0.21 maximum that a conditional Rz(0.873) can produce. The apparent optimum at 50 µs, the ref0 comparison and the T2 discussion are affected in the same way. In a same-job IQM control (2026-03-17), the gain from the same asymmetry (+0.19 to +0.24) vanished when the delay was applied to the target in both circuits (+0.105, +0.030, −0.016). Model statements (τ* formula, predicted gain curve, stochastic-timing regime) are marked as model predictions not confirmed by the data; leftover "8.5σ" and "<5% agreement" in the conclusion corrected. Files: EEDT_paper_v6_2.pdf / .tex and README_v6_2.md replace the V6.1 paper files and README; other scripts and figures unchanged.
WITHDRAWN (v1.2, November 2026; notice revised from v1.1). The main claim of this preprint — that πνZZτ* ≈ 0.873 rad is an observed cross-platform invariant and the optimal feedforward condition — is withdrawn. Origin of 0.873. The value comes from the best of three delays (30/50/70 µs) in a single 2026-03-15 run on ibm_marrakesh Q94–Q95, in which the feedforward circuit applied the delay only to the ancilla and the reference circuits only to the target; the apparent optimum followed the target's own Ramsey fringe and is not a feedforward result. The value was then fixed as an input. No independent test. In all later IBM runs the delay was set to τ = 0.873/(πνZZ), so the constancy holds by construction. A measurement of the optimum without 0.873 as an input was planned but not performed. νZZ values came from a detuned single-quadrature Ramsey fit later found to overestimate νZZ by ≈3× and to lose its sign. Measured quantity. The IBM values in Table 1 come from a circuit with a conditional X (not Rz), so φff does not enter; the reported GPS is Fff − Fstatic, not Pff − Pref as defined. The IQM scan and the circuit of Appendix B apply Rz before a Z-basis measurement, for which the ideal response is zero (cf. 10.5281/zenodo.20961679, Sec. 4.1). IQM. The 18 values in the archived scan files give GPS(τ = 7 µs) = −0.006 ± 0.007; the tabulated +0.026 ± 0.011 (n = 5) could not be reproduced, and no n = 29 data set was found. Operational note. Setting τ = 0.873/(πνZZ) on IBM Heron r2 gave GPS > 0 on most pairs tried; 0.873 rad is retained only as an empirical operating setting, not as an optimum or a constant. The derivation φ*ff = arg⟨eiφ⟩ is unaffected. The PDF contains this notice followed by the original text unchanged.
Withdrawn (version 2, 2026-11-06). The central claim of version 1 does not hold. A control run with a fixed qubit layout shows no state dependence of the damping, and the 465-gate failures do not test the transfer assumption. A two-page withdrawal notice precedes the unchanged original text in the PDF; the conclusions of version 1 should not be used. Control run FS40. The same three 161-gate circuits as in version 1 (identical angles) were transpiled once with a common initial layout and a fixed transpiler seed; the two-qubit gate sequence is identical for all angles, and layout and gate hash are stored with the data. On ibm_marrakesh (one job, five circuits, two repeats, 32,768 shots each) the raw ⟨K²⟩ values are 157.15, 158.63 and 158.41 (±0.65); the largest violation of the affine transfer bound is 0.5σ, against up to 13σ in July. The July effect does not recur. Most likely cause: in July the circuits were transpiled separately without a fixed layout or seed, and the layouts were not recorded. 465-gate failures. In all seven cross-validations calibration and target circuits differ in depth (140–300 two-qubit gates), so the failures show only that a per-gate extrapolation between differently routed circuits fails. The only structurally identical repeat at 465 gates agrees (107.50 ± 2.10 vs. 107.12 ± 2.17). What remains is standard practice, not a new result: fix and record layout and seed in any transfer test, and use calibration and target circuits of equal depth and routing. FS40 code and data: fs40_control_run_data_2026-11-06.zip (this record). Original data set: doi:10.5281/zenodo.22953020. Original abstract of version 1 (withdrawn): On a superconducting processor, the damping that reference-based error mitigation must carry from a reference circuit to a signal circuit is not a property of the circuit: at identical depth, routing and gate content, changing only a rotation angle moves it by twenty to thirty standard deviations (χ²/dof = 116), while three repetitions of one and the same circuit agree within shot noise (1.5). The transfer assumption behind most mitigation schemes is seldom testable, because the exact answer on the signal circuit is usually unknown. Here it is known on every circuit. The observable is collective, ⟨K²⟩ of a 24-qubit nuclear shell-model state on ibm_marrakesh, read inside a postselected symmetry sector. At 161 two-qubit gates it is reconstructed to about one unit. At 465 gates two independent corrections fail: a mixture estimator with an in-situ calibrated false-positive kernel loses identifiability, and an operator-level renormalization without any shape model misses the known values by −69 to +283 units. From this diagnosis follows a pre-flight test, costing about ten seconds of processor time, that decides before a production run whether reference-based mitigation can work for a given observable and depth.
Preparing every qubit of a superconducting processor in an equal superposition and measuring it is the simplest way to draw random bits from a cloud quantum computer, and its output is known to be biased. We quantify how much min-entropy is lost, where it is lost, and how well the loss can be predicted, using 1,974,848 Hadamard-circuit shots and 331,072 control shots from 15 sessions on three 156-qubit IBM Heron processors (ibm_fez, ibm_kingston, ibm_marrakesh), recorded between April and October 2026. Measured with the most-common-value estimator of NIST SP 800-90B against the expectation for an ideal source, the deficit is 2.47–5.94 bits per 127-bit word in the October sessions and 8.71 bits per 156-bit word in a one-million-shot run, and five channels carry 19–39% of it. Readout asymmetry measured in the same job explains 0.92 of the variance of the per-channel bias in that run, but the calibration data published with the device is an erratic predictor (Spearman 0.01–0.58 between |bias| and reported readout error) and occasionally predicts the wrong sign. The bias profile is reproducible over minutes, but its Pearson correlation drops to 0.10–0.22 within 12–27 hours. Excluding the channels that are most biased in a single 32,768-shot pilot job removes 27–53% of the deficit on held-out data when ten channels are dropped, within 0.40 bits of an oracle and at least as good as calibration-based exclusion in 138 of 140 comparisons, while a list taken hours earlier loses most of that benefit. Finally, the most consistent defect over six months is invisible to any per-channel test: two coupled qubits of ibm_marrakesh produce anticorrelated outcomes (r = −0.29 to −0.56) in every session we recorded on that device. We conclude that randomness drawn from such devices needs per-session, data-driven channel selection and pairwise as well as per-channel monitoring, and that none of these statistical checks certifies quantum origin.
v10 (20 April 2026): Added VQE H₂ simulator results (qtrls_vqe_h2_results.json). QTRLS applied to H₂ ground state energy minimisation (STO-3G basis, 4 qubits). 20/20 trials converged. Mean final energy −1.8478 Hartree against exact −1.8572 Hartree. F_R coupling confirmed. v9 (18 April 2026): Added 8-qubit multi-trial hardware validation results. 5 independent trials on IonQ Forte QPU. Mean F_R = 0.8538 ± 0.0099, range [0.8360, 0.8642]. Confirms reproducibility of F_R signal at 8-qubit scale. Single-trial reference F_R = 0.8671 is within one standard deviation of multi-trial mean. Trial job IDs: Trial 1: fwd 966fa5b2-3b05-11f1-bd96-96a58bb47abc, rev 985cf99c-3b05-11f1-bd96-96a58bb47abc, F_R = 0.8618 Trial 2: fwd 3b93178a-3b07-11f1-bd96-96a58bb47abc, rev 3cbc3722-3b07-11f1-bd96-96a58bb47abc, F_R = 0.8539 Trial 3: fwd 966aad70-3b08-11f1-bd96-96a58bb47abc, rev 97d35658-3b08-11f1-bd96-96a58bb47abc, F_R = 0.8529 Trial 4: fwd 81bd4198-3b09-11f1-bd96-96a58bb47abc, rev 83143c90-3b09-11f1-bd96-96a58bb47abc, F_R = 0.8360 Trial 5: fwd 6e5128e4-3b0a-11f1-bd96-96a58bb47abc, rev 6f92a930-3b0a-11f1-bd96-96a58bb47abc, F_R = 0.8642 v8 (18 April 2026): Added 8-qubit hardware validation results. Paper submitted to npj Quantum Information on 18 April 2026 (submission ID: 253a94b1-2733-475e-a1f1-16c06d506b40). 8-Qubit Hardware Validation (18 April 2026) Single-trial 8-qubit F_R measurement on IonQ Forte QPU (ionq.qpu.forte-1) via Azure Quantum. 1000 shots each. F_R estimated via Bhattacharyya coefficient between forward and reverse measurement distributions. Hardware F_R = 0.8671 vs simulator baseline mean of 0.9179 (50 trials). Confirms F_R coupling is measurable at 8-qubit scale on real hardware. Verifiable job provenance: Forward job ID: 4d81dfb8-3ade-11f1-9c84-96a58bb47abc Reverse job ID: 4ec4764c-3ade-11f1-9c84-96a58bb47abc Target: ionq.qpu.forte-1 Workspace: sharaf-hw4 (Azure Quantum, East US) Date: 18 April 2026 4-Qubit Hardware Validation (18 April 2026) Single-trial and 5-trial validation on IonQ Forte QPU via Azure Quantum. 1000 shots each. Hardware F_R = 0.9945 (single trial), 0.9949 ± 0.0016 (5-trial mean). Simulator baseline mean F_R = 0.9508 (50 trials). Verifiable job provenance: Forward job ID: 5c4dc0da-3ac9-11f1-a37c-96a58bb47abc Reverse job ID: 5d6bb990-3ac9-11f1-a37c-96a58bb47abc Target: ionq.qpu.forte-1 Workspace: sharaf-hw4 (Azure Quantum, East US) Date: 18 April 2026 Raw results: qtrls_hardware_result.json, qtrls_hardware_multitrials.json, qtrls_hardware_8q.json, qtrls_hardware_8q_multitrials_v2.json, qtrls_vqe_h2_results.json Simulator Validation (17–18 April 2026) 150/150 trials converged across 4, 8, and 16 qubit scales. All gradients computed via parameter shift rule on real quantum circuits (v3 correction, 17 April 2026). 4-qubit: 50/50 convergence, mean final F_R = 0.9508 ± 0.0080, mean convergence iteration 123.8 8-qubit: 50/50 convergence, mean final F_R = 0.9179 ± 0.0022, mean convergence iteration 30.8 16-qubit: 50/50 convergence, mean final F_R = 0.7924 ± 0.0143, mean convergence iteration 37.8 Full scaling law confirmed across all three qubit scales. Version History v10 — 20 April 2026: VQE H₂ simulator results added. 20/20 convergence. Mean final energy −1.8478 Hartree. v9 — 18 April 2026: 8-qubit multi-trial hardware results added. 5 trials, mean F_R = 0.8538 ± 0.0099. v8 — 18 April 2026: 8-qubit single-trial hardware results added. Paper submitted to npj Quantum Information. v7 — 18 April 2026: 4-qubit hardware validation on IonQ Forte. Single-trial F_R = 0.9945. Job IDs included. v6 — 18 April 2026: 16-qubit scaling validation complete. 50/50 convergence. Mean F_R = 0.7924. 150/150 total trials converged. v5 — 17 April 2026: 8-qubit scaling validation. 50/50 convergence. Mean F_R = 0.9179. Mean convergence iteration 30.8. v4 — 17 April 2026: 50-trial 4-qubit independent validation. 100% convergence. Mean F_R = 0.9508. v3.1 — 17 April 2026: Implementation details removed from correction notice for confidentiality. v3 — 17 April 2026: Critical implementation error in v2 corrected. All results from v3 onward are valid. v2 — 17 April 2026: First simulation validation results. 50 independent runs, 100% convergence above F_R 0.85. v1 — 13 April 2026: Initial deposit. Patent GB2608473.1 filed. Code available on request. Patent GB2608473.1 (filed 13 April 2026). All hardware results are publicly verifiable via Azure Quantum job IDs.
Version 3 (2026-08-25). Two attribution repairs against the archived analysis log, no measured number changed; carried as a dated in-body correction record. (i) v2's abstract and finding section attached "z = +7.1" to the cross-context identity itself. The identity's own maxima are z = +5.3 statistical (+4.7 with the model systematic), and the +7.1 values are det M* residual rows sitting ABOVE prediction -- more positivity margin, not the identity firing. The noise-model condition's failure "at z up to +7.1" remains correct as stated, since that pre-committed condition spans the full residual suite. (ii) v2 called the 0.038-0.058 band "radians"; those are the unharmonized-control expectation values, and the harmonized extractor's phase magnitudes ran 0.025-0.036 radians, shrinking about 32 percent between sessions -- both columns are now named. One verdict-vocabulary note for readers of the pre-registration files: session two's formal pre-committed outcome was the PARTIAL row (multiple mechanisms; DD next window), and mechanism language elsewhere in the note should be read at that grade. Version 2 (2026-08-21). REFRAMED FOR DEVICE-CHARACTERIZATION READERS. No measurement changes; the numbers, sessions, and ledger are identical to v1. What changed and why. v1 was written as a hardware companion to a quantum-foundations paper, and its first line asked the reader to care about an interior Born audit. The device result inside it does not depend on that framing at all: it is a diagnostic technique and a measurement, both usable by anyone characterizing a superconducting processor. v2 leads with them. The technique: a CROSS-CONTEXT CONSISTENCY IDENTITY -- an overdetermination surplus among tomographic reconstructions taken under measurement contexts whose transpiled SCHEDULES differ -- detects coherent, schedule-accumulated crosstalk that per-gate, per-qubit noise models are structurally blind to, and separates it from readout error using data already in hand, with no additional circuits. A new self-contained section states the four-step protocol (detect against a calibrated-simulator floor, discriminate coherent from readout by which residual fires, localize with zero-write baselines, confirm by schedule harmonization) together with its limitation: it sees only what makes contexts disagree, so an error common to all contexts is invisible and the remedy there is deliberate de-harmonization. The measurement, on ibm_kingston (Heron-class): the cross-context identity fired at up to z = +5.3 over a calibrated noisy-simulator floor (+4.7 with the model systematic; residual z-scores elsewhere in the estimator suite reach +7.1, on det M* rows sitting above prediction) while every readout monitor stayed clean; zero-write baselines localized the cause to the single coupler (24,23) as a few-kilohertz coherent residual ZZ producing a 5.8 percent spurious quadrature polarization on one memory qubit and absent on the neighbouring coupler (24,25); a pre-registered harmonization experiment collapsed the identity residual five-fold onto its floor, converting the violation into a measurable gauge; and a tracker bounded the crosstalk phase's coherence time to between roughly three and sixty minutes WITHIN a single calibration epoch, with a 6.3 sigma sign reversal at about 60-minute lag, falsifying the authors' own first attribution to daily recalibration. Total cost 554 seconds of public free-tier processor time. Also corrected in v2: the significance of the withheld estimate is now stated. The conditional Born-deviation bound was not issued because a pre-committed noise-model condition failed. The deviation-shaped number that the falsified model produces, quarantined in the ledger, is -0.203 +- 0.094 at 95 percent, which implies a standard error of 0.048 and places it 4.2 SIGMA FROM ZERO. v1 reported the number but not its size. A 4.2 sigma deviation-shaped result is not a marginal hint; it is the size of thing that gets published as a signal, and it was withheld because a gate stated in advance fired when firing was expensive. Hardware companion to "Gleason from Inside". Three sessions on ibm_kingston (554 of 600 free-tier seconds): the interior Born audit ran end to end, self-calibrated, certified positivity live at the lattice boundary, and kept its readout thermometer clean (claim A); the quantitative Born bound was not issued, exactly as pre-committed, because its noise-model condition failed; and that failure is the finding: schedule-accumulated coherent crosstalk on one coupler, detected by the cross-context identity, localized by zero-write baselines, converted into a gauge by schedule harmonization (five-fold collapse of the violation), and tracked in time (the phase flips sign within a single calibration epoch; coherence time 3 to 60 minutes; our own recalibration attribution falsified and corrected). Detect, localize, discriminate, track, on 9.2 minutes of free-tier time. The discipline (hash-frozen analysis, pre-committed outcome tables, credential lint extended from topology into time) is documented as a result in itself.