Challenges
Datasets
Workspaces
Papers
Discussions
Leaderboard
Log inSign up
Challenges
Datasets
Workspaces
Papers
Discussions
Leaderboard
Blog
Job Board
Q3AS

© 2026 Aqora Quantum S.A.S.

TermsPrivacyLegal Notice

Preregistration: TESSERACT-MAP-04, does a per-job readout probe choose better qubits than published calibration? Three IBM Heron r2 processors

Devin Phillip Davis

Published Nov 20, 2026• 0 citations
Publisher

Abstract

Published before any MAP-04 job. Follows TESSERACT-MAP-03 (doi:10.5281/zenodo.24406525), where a qubit on the calibration-ranked best path read |0> as 1 in 54% of shots while IBM listed ~1%. Per backend (ibm_marrakesh primary; ibm_fez, ibm_kingston replications): a 6-PUB all-0/all-1 readout probe on every qubit, then a 60-PUB main job comparing a 40-qubit chain on the probe-ranked best path, the calibration-ranked best path (MAP-02 rule), Qiskit's stock level-3 layout, and the probe-ranked median path. Contrasts L1–L4 (Holm), decision rules, and the exact selection/analysis code are included.

DOI
10.5281/zenodo.24406639

Related papers

Preregistration: TESSERACT-MAP-05, keep the calibration ranking and exclude only grossly faulty readout qubits: three IBM Heron r2 processors

Devin Phillip Davis

Published before any MAP-05 job. Follows TESSERACT-MAP-04 (doi:10.5281/zenodo.24407001). Per backend (ibm_marrakesh, ibm_fez, ibm_kingston): a readout probe on every qubit, then a 60-PUB job comparing the calibration-ranked 40-qubit path, the same rule with qubits of probe readout error > 0.15 removed, the probe-ranked path, and Qiskit's stock layout. Contrasts M1–M4, decision rules and exact code included.

•Nov 20, 2026•0 citations

A per-job readout probe rescues qubit selection on one IBM Heron r2 processor and hurts it on another: a preregistered three-device test (TESSERACT-MAP-04)

Devin Phillip Davis

Preregistered (doi:10.5281/zenodo.24406640) test on ibm_marrakesh, ibm_fez and ibm_kingston (6 jobs, 121 s QPU) of ranking 40-qubit paths with a few-second all-qubit readout probe instead of IBM's published readout errors. ibm_marrakesh: probe path won by +25.0 pp (F_cl 0.313 vs 0.063); the calibration path again used qubit 46 (probe 34% readout error, listed 1.1%). ibm_fez: probe path lost by 3.6 pp; Qiskit's stock layout was best. ibm_kingston: no difference, despite a 20% readout qubit listed at 1.0% on the calibration path. After readout mitigation the calibration-ranked path was better on all three devices. Verdict by the preregistered rule: helps on 1 of 3 devices; does not generalise. Undisclosed readout faults were present on 2 of 3 processors. Record contains paper, source, probe and main-job counts, calibrations, locks, QPYs, analyses and code.

•Nov 20, 2026•0 citations

Four days later, the best qubits were the worst: a preregistered replication on ibm_marrakesh in which readout faults invisible to the published calibration reversed a 10 pp layout effect (TESSERACT-MAP-03)

Devin Phillip Davis

Preregistered follow-up (doi:10.5281/zenodo.24406496, published before submission) to TESSERACT-MAP-02 (doi:10.5281/zenodo.24406426). Job dc0ajv5s2omc738915k0 on ibm_marrakesh, 80 PUBs, 47 s QPU, same physical qubits as MAP-02 four days later. The 10.5 pp best-vs-median path gap did not replicate: it reversed to −4.29 pp (95% CI [−5.24, −3.33], Holm p = 6.4e-6). Cause: qubit 46 on the best path read |0> as 1 in 54% of shots while IBM's calibration listed ~1.1% readout error; q31 and q37 also degraded. After tensored readout mitigation the best path leads again by +17.0 pp. The path effect is not additive across chain and routed star (interaction −5.64 pp). Today's stock level-3 layout beat the MAP-02 best path by 1.75 pp. Layout rankings built on published calibration can be overturned within days by single-qubit readout faults; a per-job union readout check catches them. Record contains the paper, source, preregistration, lock, QPY, calibrations, raw counts, analysis and code.

•Nov 20, 2026•0 citations

Qubit-selection rules for IBM Heron r2 do not hold their ranking for ninety minutes: a preregistered exclusion test and an unplanned sign flip on three processors (TESSERACT-MAP-05)

Devin Phillip Davis

Preregistered (doi:10.5281/zenodo.24407538) on ibm_marrakesh, ibm_fez, ibm_kingston; 6 jobs, 120 s QPU. Excluding qubits with probe readout error > 15% from the calibration-ranked path helped where such a qubit was on the path (+2.3 pp fez, +4.7 pp kingston), null on marrakesh. Plain probe ranking beat exclusion on fez and kingston; the preregistered conclusion is not supported. Probe-vs-calibration ranking, rerun ~90 min after MAP-04 with the same code, flipped sign on all three devices (+25.0 to -3.0, -3.6 to +6.9, -0.3 to +7.8 pp). ibm_marrakesh qubit 46: 34.4% readout error at 20:26Z, 0.6% at 21:51Z. Readout faults are intermittent on an hour scale; single-job layout comparisons are snapshots.

•Nov 20, 2026•0 citations

Preregistration: TESSERACT-MAP-03, replication, readout attribution and rewrite x path interaction for a 40-qubit circuit on ibm_marrakesh

Devin Phillip Davis

Preregistration, published before submission, of a follow-up to TESSERACT-MAP-02 (doi:10.5281/zenodo.24406426). One job on ibm_marrakesh: 10 blocks × 8 circuits × 2,048 shots (80 PUBs, est. 49.5 s QPU). Arms replay MAP-02's best-path, median-path and stock-layout qubits, add today's stock layout, and add the missing star/median-path cell; union readout calibration on all 81 qubits. Five Holm-corrected contrasts: K1 path-gap replication; K2 readout share of the gap (raw minus tensored readout-mitigated); K3 rewrite × path interaction; K4 best path vs MAP-02 stock qubits; K5 best path vs today's stock layout. Contains the preregistration, the lock (SHA-256 ea7e8765…), the compiled QPY (f15167c4…), the lock-time calibration, a noiseless simulation and synthetic-mitigation dry run, and the build, analysis and submission code (20beb4e3…).

•Nov 20, 2026•0 citations

Same gate count, half the fidelity: a preregistered decomposition of layout, routing and optimisation-level effects on a 40-qubit circuit on ibm_marrakesh (TESSERACT-MAP-02)

Devin Phillip Davis

Preregistered, blocked hardware experiment on the 156-qubit IBM Heron r2 processor ibm_marrakesh (job dbto408n26qs739tnrj0; 10 blocks × 9 circuits × 2,048 shots; 53 s QPU) separating four compilation factors for a 40-qubit circuit with an exact four-string output distribution. Rewriting a degree-20 CNOT star into an equivalent degree-2 chain and removing all SWAPs on the same 40 qubits raised classical fidelity by +14.27 pp (opt 3) and +12.47 pp (opt 1). At a fixed 39 CZ and depth 66, a calibration-ranked best path beat a median path by +10.54 pp (95% CI [+9.95, +11.12]), halving the fidelity. A greedy calibration-weighted path beat Qiskit's stock level-3 layout by +5.70 pp, the reverse of a FakeMarrakesh simulation made before the run. A virtual-Z A/A control was null (−0.24 pp, 95% CI [−0.88, +0.41]). Union readout calibration found 22.3% and 12.1% assignment error on two qubits IBM listed near 1%; both lie on the losing layouts. All effect contrasts survive Holm correction and an exact Wilcoxon check. One job on one device; these are compilation and device-heterogeneity effects only. The record contains the paper, LaTeX source, preregistration and amendment A-1, the lock file (SHA-256 5f4a04c4…) and QPY (409dc736…) pushed before submission, raw counts for all 90 PUBs, analysis outputs and the scripts that regenerate every number.

•Nov 20, 2026•0 citations
Published before any MAP-04 job. Follows TESSERACT-MAP-03 (doi:10.5281/zenodo.24406525), where a qubit on the calibration-ranked best path read |0> as 1 in 54% of shots while IBM listed ~1%. Per backend (ibm_marrakesh primary; ibm_fez, ibm_kingston replications): a 6-PUB all-0/all-1 readout probe on every qubit, then a 60-PUB main job comparing a 40-qubit chain on the probe-ranked best path, the calibration-ranked best path (MAP-02 rule), Qiskit's stock level-3 layout, and the probe-ranked median path. Contrasts L1–L4 (Holm), decision rules, and the exact selection/analysis code are included.
Preregistered (doi:10.5281/zenodo.24406640) test on ibm_marrakesh, ibm_fez and ibm_kingston (6 jobs, 121 s QPU) of ranking 40-qubit paths with a few-second all-qubit readout probe instead of IBM's published readout errors. ibm_marrakesh: probe path won by +25.0 pp (F_cl 0.313 vs 0.063); the calibration path again used qubit 46 (probe 34% readout error, listed 1.1%). ibm_fez: probe path lost by 3.6 pp; Qiskit's stock layout was best. ibm_kingston: no difference, despite a 20% readout qubit listed at 1.0% on the calibration path. After readout mitigation the calibration-ranked path was better on all three devices. Verdict by the preregistered rule: helps on 1 of 3 devices; does not generalise. Undisclosed readout faults were present on 2 of 3 processors. Record contains paper, source, probe and main-job counts, calibrations, locks, QPYs, analyses and code.
Preregistered follow-up (doi:10.5281/zenodo.24406496, published before submission) to TESSERACT-MAP-02 (doi:10.5281/zenodo.24406426). Job dc0ajv5s2omc738915k0 on ibm_marrakesh, 80 PUBs, 47 s QPU, same physical qubits as MAP-02 four days later. The 10.5 pp best-vs-median path gap did not replicate: it reversed to −4.29 pp (95% CI [−5.24, −3.33], Holm p = 6.4e-6). Cause: qubit 46 on the best path read |0> as 1 in 54% of shots while IBM's calibration listed ~1.1% readout error; q31 and q37 also degraded. After tensored readout mitigation the best path leads again by +17.0 pp. The path effect is not additive across chain and routed star (interaction −5.64 pp). Today's stock level-3 layout beat the MAP-02 best path by 1.75 pp. Layout rankings built on published calibration can be overturned within days by single-qubit readout faults; a per-job union readout check catches them. Record contains the paper, source, preregistration, lock, QPY, calibrations, raw counts, analysis and code.
Preregistered (doi:10.5281/zenodo.24407538) on ibm_marrakesh, ibm_fez, ibm_kingston; 6 jobs, 120 s QPU. Excluding qubits with probe readout error > 15% from the calibration-ranked path helped where such a qubit was on the path (+2.3 pp fez, +4.7 pp kingston), null on marrakesh. Plain probe ranking beat exclusion on fez and kingston; the preregistered conclusion is not supported. Probe-vs-calibration ranking, rerun ~90 min after MAP-04 with the same code, flipped sign on all three devices (+25.0 to -3.0, -3.6 to +6.9, -0.3 to +7.8 pp). ibm_marrakesh qubit 46: 34.4% readout error at 20:26Z, 0.6% at 21:51Z. Readout faults are intermittent on an hour scale; single-job layout comparisons are snapshots.
Preregistration, published before submission, of a follow-up to TESSERACT-MAP-02 (doi:10.5281/zenodo.24406426). One job on ibm_marrakesh: 10 blocks × 8 circuits × 2,048 shots (80 PUBs, est. 49.5 s QPU). Arms replay MAP-02's best-path, median-path and stock-layout qubits, add today's stock layout, and add the missing star/median-path cell; union readout calibration on all 81 qubits. Five Holm-corrected contrasts: K1 path-gap replication; K2 readout share of the gap (raw minus tensored readout-mitigated); K3 rewrite × path interaction; K4 best path vs MAP-02 stock qubits; K5 best path vs today's stock layout. Contains the preregistration, the lock (SHA-256 ea7e8765…), the compiled QPY (f15167c4…), the lock-time calibration, a noiseless simulation and synthetic-mitigation dry run, and the build, analysis and submission code (20beb4e3…).
Preregistered, blocked hardware experiment on the 156-qubit IBM Heron r2 processor ibm_marrakesh (job dbto408n26qs739tnrj0; 10 blocks × 9 circuits × 2,048 shots; 53 s QPU) separating four compilation factors for a 40-qubit circuit with an exact four-string output distribution. Rewriting a degree-20 CNOT star into an equivalent degree-2 chain and removing all SWAPs on the same 40 qubits raised classical fidelity by +14.27 pp (opt 3) and +12.47 pp (opt 1). At a fixed 39 CZ and depth 66, a calibration-ranked best path beat a median path by +10.54 pp (95% CI [+9.95, +11.12]), halving the fidelity. A greedy calibration-weighted path beat Qiskit's stock level-3 layout by +5.70 pp, the reverse of a FakeMarrakesh simulation made before the run. A virtual-Z A/A control was null (−0.24 pp, 95% CI [−0.88, +0.41]). Union readout calibration found 22.3% and 12.1% assignment error on two qubits IBM listed near 1%; both lie on the losing layouts. All effect contrasts survive Holm correction and an exact Wilcoxon check. One job on one device; these are compilation and device-heterogeneity effects only. The record contains the paper, LaTeX source, preregistration and amendment A-1, the lock file (SHA-256 5f4a04c4…) and QPY (409dc736…) pushed before submission, raw counts for all 90 PUBs, analysis outputs and the scripts that regenerate every number.