Challenges
Datasets
Workspaces
Papers
Discussions
Leaderboard
Log inSign up
Challenges
Datasets
Workspaces
Papers
Discussions
Leaderboard
Blog
Job Board
Q3AS

© 2026 Aqora Quantum S.A.S.

TermsPrivacyLegal Notice

Preregistration: TESSERACT-MAP-03, replication, readout attribution and rewrite x path interaction for a 40-qubit circuit on ibm_marrakesh

Devin Phillip Davis

Published Nov 20, 2026• 0 citations
Publisher

Abstract

Preregistration, published before submission, of a follow-up to TESSERACT-MAP-02 (doi:10.5281/zenodo.24406426). One job on ibm_marrakesh: 10 blocks × 8 circuits × 2,048 shots (80 PUBs, est. 49.5 s QPU). Arms replay MAP-02's best-path, median-path and stock-layout qubits, add today's stock layout, and add the missing star/median-path cell; union readout calibration on all 81 qubits. Five Holm-corrected contrasts: K1 path-gap replication; K2 readout share of the gap (raw minus tensored readout-mitigated); K3 rewrite × path interaction; K4 best path vs MAP-02 stock qubits; K5 best path vs today's stock layout. Contains the preregistration, the lock (SHA-256 ea7e8765…), the compiled QPY (f15167c4…), the lock-time calibration, a noiseless simulation and synthetic-mitigation dry run, and the build, analysis and submission code (20beb4e3…).

DOI
10.5281/zenodo.24406495

Related papers

Four days later, the best qubits were the worst: a preregistered replication on ibm_marrakesh in which readout faults invisible to the published calibration reversed a 10 pp layout effect (TESSERACT-MAP-03)

Devin Phillip Davis

Preregistered follow-up (doi:10.5281/zenodo.24406496, published before submission) to TESSERACT-MAP-02 (doi:10.5281/zenodo.24406426). Job dc0ajv5s2omc738915k0 on ibm_marrakesh, 80 PUBs, 47 s QPU, same physical qubits as MAP-02 four days later. The 10.5 pp best-vs-median path gap did not replicate: it reversed to −4.29 pp (95% CI [−5.24, −3.33], Holm p = 6.4e-6). Cause: qubit 46 on the best path read |0> as 1 in 54% of shots while IBM's calibration listed ~1.1% readout error; q31 and q37 also degraded. After tensored readout mitigation the best path leads again by +17.0 pp. The path effect is not additive across chain and routed star (interaction −5.64 pp). Today's stock level-3 layout beat the MAP-02 best path by 1.75 pp. Layout rankings built on published calibration can be overturned within days by single-qubit readout faults; a per-job union readout check catches them. Record contains the paper, source, preregistration, lock, QPY, calibrations, raw counts, analysis and code.

•Nov 20, 2026•0 citations

Same gate count, half the fidelity: a preregistered decomposition of layout, routing and optimisation-level effects on a 40-qubit circuit on ibm_marrakesh (TESSERACT-MAP-02)

Devin Phillip Davis

Preregistered, blocked hardware experiment on the 156-qubit IBM Heron r2 processor ibm_marrakesh (job dbto408n26qs739tnrj0; 10 blocks × 9 circuits × 2,048 shots; 53 s QPU) separating four compilation factors for a 40-qubit circuit with an exact four-string output distribution. Rewriting a degree-20 CNOT star into an equivalent degree-2 chain and removing all SWAPs on the same 40 qubits raised classical fidelity by +14.27 pp (opt 3) and +12.47 pp (opt 1). At a fixed 39 CZ and depth 66, a calibration-ranked best path beat a median path by +10.54 pp (95% CI [+9.95, +11.12]), halving the fidelity. A greedy calibration-weighted path beat Qiskit's stock level-3 layout by +5.70 pp, the reverse of a FakeMarrakesh simulation made before the run. A virtual-Z A/A control was null (−0.24 pp, 95% CI [−0.88, +0.41]). Union readout calibration found 22.3% and 12.1% assignment error on two qubits IBM listed near 1%; both lie on the losing layouts. All effect contrasts survive Holm correction and an exact Wilcoxon check. One job on one device; these are compilation and device-heterogeneity effects only. The record contains the paper, LaTeX source, preregistration and amendment A-1, the lock file (SHA-256 5f4a04c4…) and QPY (409dc736…) pushed before submission, raw counts for all 90 PUBs, analysis outputs and the scripts that regenerate every number.

•Nov 20, 2026•0 citations

Preregistration: TESSERACT-MAP-05, keep the calibration ranking and exclude only grossly faulty readout qubits: three IBM Heron r2 processors

Devin Phillip Davis

Published before any MAP-05 job. Follows TESSERACT-MAP-04 (doi:10.5281/zenodo.24407001). Per backend (ibm_marrakesh, ibm_fez, ibm_kingston): a readout probe on every qubit, then a 60-PUB job comparing the calibration-ranked 40-qubit path, the same rule with qubits of probe readout error > 0.15 removed, the probe-ranked path, and Qiskit's stock layout. Contrasts M1–M4, decision rules and exact code included.

•Nov 20, 2026•0 citations

Preregistration: TESSERACT-MAP-04, does a per-job readout probe choose better qubits than published calibration? Three IBM Heron r2 processors

Devin Phillip Davis

Published before any MAP-04 job. Follows TESSERACT-MAP-03 (doi:10.5281/zenodo.24406525), where a qubit on the calibration-ranked best path read |0> as 1 in 54% of shots while IBM listed ~1%. Per backend (ibm_marrakesh primary; ibm_fez, ibm_kingston replications): a 6-PUB all-0/all-1 readout probe on every qubit, then a 60-PUB main job comparing a 40-qubit chain on the probe-ranked best path, the calibration-ranked best path (MAP-02 rule), Qiskit's stock level-3 layout, and the probe-ranked median path. Contrasts L1–L4 (Holm), decision rules, and the exact selection/analysis code are included.

•Nov 20, 2026•0 citations

A per-job readout probe rescues qubit selection on one IBM Heron r2 processor and hurts it on another: a preregistered three-device test (TESSERACT-MAP-04)

Devin Phillip Davis

Preregistered (doi:10.5281/zenodo.24406640) test on ibm_marrakesh, ibm_fez and ibm_kingston (6 jobs, 121 s QPU) of ranking 40-qubit paths with a few-second all-qubit readout probe instead of IBM's published readout errors. ibm_marrakesh: probe path won by +25.0 pp (F_cl 0.313 vs 0.063); the calibration path again used qubit 46 (probe 34% readout error, listed 1.1%). ibm_fez: probe path lost by 3.6 pp; Qiskit's stock layout was best. ibm_kingston: no difference, despite a 20% readout qubit listed at 1.0% on the calibration path. After readout mitigation the calibration-ranked path was better on all three devices. Verdict by the preregistered rule: helps on 1 of 3 devices; does not generalise. Undisclosed readout faults were present on 2 of 3 processors. Record contains paper, source, probe and main-job counts, calibrations, locks, QPYs, analyses and code.

•Nov 20, 2026•0 citations

Qubit-selection rules for IBM Heron r2 do not hold their ranking for ninety minutes: a preregistered exclusion test and an unplanned sign flip on three processors (TESSERACT-MAP-05)

Devin Phillip Davis

Preregistered (doi:10.5281/zenodo.24407538) on ibm_marrakesh, ibm_fez, ibm_kingston; 6 jobs, 120 s QPU. Excluding qubits with probe readout error > 15% from the calibration-ranked path helped where such a qubit was on the path (+2.3 pp fez, +4.7 pp kingston), null on marrakesh. Plain probe ranking beat exclusion on fez and kingston; the preregistered conclusion is not supported. Probe-vs-calibration ranking, rerun ~90 min after MAP-04 with the same code, flipped sign on all three devices (+25.0 to -3.0, -3.6 to +6.9, -0.3 to +7.8 pp). ibm_marrakesh qubit 46: 34.4% readout error at 20:26Z, 0.6% at 21:51Z. Readout faults are intermittent on an hour scale; single-job layout comparisons are snapshots.

•Nov 20, 2026•0 citations
Preregistration, published before submission, of a follow-up to TESSERACT-MAP-02 (doi:10.5281/zenodo.24406426). One job on ibm_marrakesh: 10 blocks × 8 circuits × 2,048 shots (80 PUBs, est. 49.5 s QPU). Arms replay MAP-02's best-path, median-path and stock-layout qubits, add today's stock layout, and add the missing star/median-path cell; union readout calibration on all 81 qubits. Five Holm-corrected contrasts: K1 path-gap replication; K2 readout share of the gap (raw minus tensored readout-mitigated); K3 rewrite × path interaction; K4 best path vs MAP-02 stock qubits; K5 best path vs today's stock layout. Contains the preregistration, the lock (SHA-256 ea7e8765…), the compiled QPY (f15167c4…), the lock-time calibration, a noiseless simulation and synthetic-mitigation dry run, and the build, analysis and submission code (20beb4e3…).
Preregistered follow-up (doi:10.5281/zenodo.24406496, published before submission) to TESSERACT-MAP-02 (doi:10.5281/zenodo.24406426). Job dc0ajv5s2omc738915k0 on ibm_marrakesh, 80 PUBs, 47 s QPU, same physical qubits as MAP-02 four days later. The 10.5 pp best-vs-median path gap did not replicate: it reversed to −4.29 pp (95% CI [−5.24, −3.33], Holm p = 6.4e-6). Cause: qubit 46 on the best path read |0> as 1 in 54% of shots while IBM's calibration listed ~1.1% readout error; q31 and q37 also degraded. After tensored readout mitigation the best path leads again by +17.0 pp. The path effect is not additive across chain and routed star (interaction −5.64 pp). Today's stock level-3 layout beat the MAP-02 best path by 1.75 pp. Layout rankings built on published calibration can be overturned within days by single-qubit readout faults; a per-job union readout check catches them. Record contains the paper, source, preregistration, lock, QPY, calibrations, raw counts, analysis and code.
Preregistered, blocked hardware experiment on the 156-qubit IBM Heron r2 processor ibm_marrakesh (job dbto408n26qs739tnrj0; 10 blocks × 9 circuits × 2,048 shots; 53 s QPU) separating four compilation factors for a 40-qubit circuit with an exact four-string output distribution. Rewriting a degree-20 CNOT star into an equivalent degree-2 chain and removing all SWAPs on the same 40 qubits raised classical fidelity by +14.27 pp (opt 3) and +12.47 pp (opt 1). At a fixed 39 CZ and depth 66, a calibration-ranked best path beat a median path by +10.54 pp (95% CI [+9.95, +11.12]), halving the fidelity. A greedy calibration-weighted path beat Qiskit's stock level-3 layout by +5.70 pp, the reverse of a FakeMarrakesh simulation made before the run. A virtual-Z A/A control was null (−0.24 pp, 95% CI [−0.88, +0.41]). Union readout calibration found 22.3% and 12.1% assignment error on two qubits IBM listed near 1%; both lie on the losing layouts. All effect contrasts survive Holm correction and an exact Wilcoxon check. One job on one device; these are compilation and device-heterogeneity effects only. The record contains the paper, LaTeX source, preregistration and amendment A-1, the lock file (SHA-256 5f4a04c4…) and QPY (409dc736…) pushed before submission, raw counts for all 90 PUBs, analysis outputs and the scripts that regenerate every number.
Published before any MAP-04 job. Follows TESSERACT-MAP-03 (doi:10.5281/zenodo.24406525), where a qubit on the calibration-ranked best path read |0> as 1 in 54% of shots while IBM listed ~1%. Per backend (ibm_marrakesh primary; ibm_fez, ibm_kingston replications): a 6-PUB all-0/all-1 readout probe on every qubit, then a 60-PUB main job comparing a 40-qubit chain on the probe-ranked best path, the calibration-ranked best path (MAP-02 rule), Qiskit's stock level-3 layout, and the probe-ranked median path. Contrasts L1–L4 (Holm), decision rules, and the exact selection/analysis code are included.
Preregistered (doi:10.5281/zenodo.24406640) test on ibm_marrakesh, ibm_fez and ibm_kingston (6 jobs, 121 s QPU) of ranking 40-qubit paths with a few-second all-qubit readout probe instead of IBM's published readout errors. ibm_marrakesh: probe path won by +25.0 pp (F_cl 0.313 vs 0.063); the calibration path again used qubit 46 (probe 34% readout error, listed 1.1%). ibm_fez: probe path lost by 3.6 pp; Qiskit's stock layout was best. ibm_kingston: no difference, despite a 20% readout qubit listed at 1.0% on the calibration path. After readout mitigation the calibration-ranked path was better on all three devices. Verdict by the preregistered rule: helps on 1 of 3 devices; does not generalise. Undisclosed readout faults were present on 2 of 3 processors. Record contains paper, source, probe and main-job counts, calibrations, locks, QPYs, analyses and code.
Preregistered (doi:10.5281/zenodo.24407538) on ibm_marrakesh, ibm_fez, ibm_kingston; 6 jobs, 120 s QPU. Excluding qubits with probe readout error > 15% from the calibration-ranked path helped where such a qubit was on the path (+2.3 pp fez, +4.7 pp kingston), null on marrakesh. Plain probe ranking beat exclusion on fez and kingston; the preregistered conclusion is not supported. Probe-vs-calibration ranking, rerun ~90 min after MAP-04 with the same code, flipped sign on all three devices (+25.0 to -3.0, -3.6 to +6.9, -0.3 to +7.8 pp). ibm_marrakesh qubit 46: 34.4% readout error at 20:26Z, 0.6% at 21:51Z. Readout faults are intermittent on an hour scale; single-job layout comparisons are snapshots.