Challenges
Datasets
Workspaces
Papers
Discussions
Leaderboard
Log inSign up
Challenges
Datasets
Workspaces
Papers
Discussions
Leaderboard
Blog
Job Board
Q3AS

© 2026 Aqora Quantum S.A.S.

TermsPrivacyLegal Notice
Optimization of Preventative Maintenance Requests background cover

edf-pmrq / Optimization of Preventative Maintenance Requests

Join now
Overview
Docs
Code
Rules
Discussion
Leaderboard

Track host

EDF

EDF

Tracks: 0

Tags

  • Energy

Table of contents

  • Requests principal
  • PMRQ credited
  • Expected output and value function
  • Instance definition
  • Calculation of the cost and the credit obtained
  • Toy Example

Timeline

No timeline is available yet.

Description

Requests principal

A production park requires periodic maintenance to ensure the availability of units and reduce the risk of forced shutdowns. We refer to this maintenance as Preventive Maintenance ReQuest (PMRQ). The cost of a PMRQ is related to the amount of time the production unit needs to be shut down to perform this maintenance, or to the resources, crew, and machines required for the PMRQ. In a PMRQ problem, the horizon is divided into time periods. Each PMRQ must be performed at a given frequency, with a certain tolerance. Note that the number of occurrences of a given PMRQ within the optimization period is not fixed, as the tolerance allows for postponing an occurrence of a PMRQ out the period.

PMRQ credited

When performing a large PMRQ, it is possible to realize smaller PMRQs without the need for extra time or resources, i.e., at a cost of 0. When PMRQ AAA enables PMRQ BBB to be performed at no cost, we say that BBB is credited by AAA. This credit is obtained when the two concerned PMRQs occur in the same year. The PMRQ problem involves:
  • deciding in which years to perform a set of PMRQs over a given horizon while
  • ensuring that frequency constraints are met for each PMRQ and
  • maximizing the amount of credit obtained.

Expected output and value function

A solution of a given instance is a binary matrix SitS_{it}Sit​ of size #PMRQ×#Periods \#PMRQ \times \#Periods#PMRQ×#Periods where its coefficient SitS_{it}Sit​ is 1 if a maintenance on PMRQ iii was done at time ttt and 0 otherwise. The value of the solution proposed is computed by taking all the credit relation and computing the
credits obtained.

Instance definition

An instance is given by :
  • A set of PMRQs {PMRQ  i}\{\text{PMRQ \,} i\}{PMRQ i} indexed by iii. We denote by NNN the number of PMRQs.
  • Each PMRQ iii is endowed with the following properties :
    • A cost CiC_iCi​
    • A frequency fif_ifi​ in years.
    • A tolerance ϵi\epsilon_iϵi​
    • An offset oio_ioi​ corresponding to the number of periods between the first year of the current optimization and the last occurrence of the PMRQ.
  • A set of credits crijcr_{ij}crij​ between PMRQs, where crij=1cr_{ij}=1crij​=1 means that the maintenance of PMRQ iii is free if the maintenance of PMRQ jjj is done at the same time period and crij=0cr_{ij}=0crij​=0 otherwise.
  • A number of period TTT to optimize on

Calculation of the cost and the credit obtained

The total cost of a maintenance is
∑t=1T∑i=1NCiSit(1−∑j=1NcrijSjt)\sum_{t=1}^T \sum_{i=1}^N C_i S_{it}(1-\sum_{j=1}^N cr_{ij}S_{jt})∑t=1T​∑i=1N​Ci​Sit​(1−∑j=1N​crij​Sjt​)
The credit obtained during this maintenance corresponds to the second part of this equation
∑t=1T∑i=1N∑j=1NCi crijSitSjt\sum_{t=1}^T \sum_{i=1}^N \sum_{j=1}^N C_i \, cr_{ij} S_{it} S_{jt}∑t=1T​∑i=1N​∑j=1N​Ci​crij​Sit​Sjt​
which is the objective function to maximise.

Toy Example

Here is an example with 4 PMRQs :
  • PMRQ 1 : o1=−1o_1 = −1o1​=−1, C1=4C_1 = 4C1​=4, f1=4f_1 = 4f1​=4, ϵ1=1\epsilon_1 = 1ϵ1​=1
  • PMRQ 2 : o2=−2o_2 = −2o2​=−2, C2=1C_2 = 1C2​=1, f2=2f_2 = 2f2​=2, ϵ2=0\epsilon_2 = 0ϵ2​=0
  • PMRQ 3 : o3=−2o_3 = −2o3​=−2, C3=2C_3 = 2C3​=2, f3=3f_3 = 3f3​=3, ϵ3=1\epsilon_3 = 1ϵ3​=1
  • PMRQ 4 : o4=−3o_4 = −3o4​=−3, C4=3C_4 = 3C4​=3, f4=5f_4 = 5f4​=5, ϵ4=2\epsilon_4 = 2ϵ4​=2
The credit are defined as:
  • PMRQ 1 credits PMRQs 2 and 4 (i.e the maintenance of PMRQ 2 and 4 can be done for free if the maintenance of PMRQ 1 is done at the same period)
  • PMRQ 3 credits PMRQs 2 (i.e. the maintenance of PMRQ 2 can be done for free if the maintenance of PMRQ 3 is done at the same period)
The number of periods is T=8T = 8T=8.
Below is the matrix for a solution for this toy instance. This solution has a credit of 6:
  • PMRQ 1 credits PMRQ 2 and 4 for a total credit of 4 at period 5
  • PMRQ 3 credits PMRQ 2 for a total credit of 1 at period 3 and 7
PMRQ 100001000
PMRQ 210101010
PMRQ 300100010
PMRQ 400001000