Resource-Observability Dual-Budget Control for QEC under Resource-Constrained Stages
Duy Hoang Nguyen
Abstract
In some embodiments, disclosed systems and methods provide resource-aware scheduling of quantum error-correction (QEC) stabilizer measurements at a resource-constrained stage. A classical controller obtains stage state data indicative of resource availability and, for each control interval, determines a measurement execution policy constrained by the stage state data (in some embodiments, comprising a measurement schedule and/or per-stabilizer execution rates or probabilities). The controller computes one or more observability-risk indicators that quantify accumulated loss of observability (or a quantitative proxy thereof), mismatch between a predictive model and observed syndrome data, and/or uncertainty of a decoder or estimator output. An observability guard enforces bounded observability by causing a full-observation operation when elapsed time since a most recent full-observation operation reaches a threshold T_max and/or when drift or elevated risk is detected, and may do so even when a controller-layer resource guard would otherwise restrict execution due to reduced resource availability, while remaining subject to an independent physical safety interlock or absolute cutoff external to the controller, when provided. In some embodiments, the resource constraint is implemented using a resource model and a time-varying resource headroom value R(t) with predicted constrained-resource consumption constrained by R(t). In some embodiments, the resource constraint is implemented using a resource-availability indicator derived directly from stage state data and reactive adaptation without requiring prediction. In some embodiments, the resource-availability indicator is derived from a computed headroom value R(t), for example as a thresholded or quantized headroom class of R(t). In some embodiments, a dual-budget formulation tracks both resource-budget state and observability-risk budget state (e.g., resource tokens and QEC-risk tokens), optionally using a sentinel subset to maintain drift visibility and to update an error/noise model under constrained resources. In a non-limiting cryogenic embodiment, stage state data comprises cryogenic state data, R(t)=H(t) comprises cooling headroom, and resource-budget state may be represented using thermal tokens.In some embodiments, the observability-risk indicator comprises a model uncertainty measure.In some embodiments, the observability guard initiates the full-observation operation according to a predetermined or randomized refresh schedule that is independent of the stage state data and independent of the resource-availability indicator, while still being subject to any independent physical safety interlock or absolute cutoff external to the classical controller, when provided.In some embodiments, the observability guard initiates the full-observation operation based on a stochastic refresh mechanism in which inter-refresh intervals are drawn from a configured probability distribution and/or are generated by a pseudorandom process, without requiring a comparison of elapsed time to a fixed threshold. In some cases, the configured probability distribution has at least one parameter that is configurable based on a drift metric and/or the observability-risk indicator.In some embodiments, the system optionally includes an independent physical safety interlock or absolute cutoff external to the classical controller; when provided, initiation and/or execution of the full-observation operation is conditioned on the interlock or cutoff, and when not provided the observability guard may initiate the full-observation operation without such conditioning.In some embodiments, non-limiting method overview (example steps): (i) obtain stage state data; (ii) derive a resource constraint from the stage state data, including by computing resource headroom R(t) using a resource model or by deriving a resource-availability indicator without using a resource model; (iii) determine or update a measurement execution policy for a control interval subject to the resource constraint; (iv) compute one or more observability-risk indicators; (v) evaluate observability-guard conditions, including a time-based threshold T_max and/or drift/risk criteria; (vi) execute stabilizer measurements according to the measurement execution policy, optionally including a sentinel subset; (vii) when triggered, execute a full-observation operation, including as a multi-interval refresh sequence; (viii) compute deviation and/or drift metrics; (ix) update an error/noise model and optionally resource-model parameters and/or budget state; and (x) repeat for subsequent control intervals.