A quantum annealing solver for the renowned job-shop scheduling problem (JSP) is presented in detail. After formulating the problem as a time-indexed quadratic unconstrained binary optimization problem, several pre-processing and graph embedding strategies are employed to compile optimally parametrized families of the JSP for scheduling instances of up to six jobs and six machines on the D-Wave Systems Vesuvius processor. Problem simplifications and partitioning algorithms, including variable pruning and running strategies that consider tailored binary searches, are discussed and the results from the processor are compared against state-of-the-art global-optimum solvers.
A quantum annealing solver for the renowned job-shop scheduling problem (JSP) is presented in detail. After formulating the problem as a time-indexed quadratic unconstrained binary optimization problem, several pre-processing and graph embedding strategies are employed to compile optimally parametrized families of the JSP for scheduling instances of up to six jobs and six machines on the D-Wave Systems Vesuvius processor. Problem simplifications and partitioning algorithms, including variable pruning and running strategies that consider tailored binary searches, are discussed and the results from the processor are compared against state-of-the-art global-optimum solvers.
A promising use of quantum computers lies in the logistics and scheduling of industrial problems, such as space mission planning, maritime management, and many others. This field is expected to provide useful applications for quantum computing at the current stage of hardware development. Quantum annealing techniques have been proposed to solve scheduling problems, along with many other optimization problems. In this work, we test quantum annealing and hybrid techniques based on the D-Wave hardware to solve scheduling problems in the framework of job shop scheduling (JSP), which consists of optimally assigning operations to certain resources, while satisfying specific constraints and minimizing the total scheduling time, known as timespan. We devised an iterative algorithm that produces valid schedules for decreasing timespan values. We implemented a refined iterative variable pruning technique, which significantly reduces the number of spin variables in the corresponding Ising model, whose low-energy configurations are sampled by using the D-Wave Hybrid Solver Service. Our novel iterative algorithm leverages a directed acyclic graph (DAG) representation of partial or complete solutions of the JSP instance, which enables an efficient update of the feasible processing time windows for each operation. This approach leads to significantly improved results compared to the standard state-of-the-art applications of quantum annealing for the JSP. Remarkably, we can often prove the absolute optimality of the obtained solution, namely that a more efficient schedule within a shorter timespan can not exist.
The emergence of specialized hardware, such as quantum computers and Digital/CMOS annealers, and the slowing of performance growth of general-purpose hardware raises an important question for our community: how can the high-performance, specialized solvers be used for planning and scheduling problems? In this work, we focus on the job-shop scheduling problem (JSP) and Quadratic Unconstrained Binary Optimization (QUBO) models, the mathematical formulation shared by a number of novel hardware platforms. We study two direct QUBO models of JSP and propose a novel large neighborhood search (LNS) approach, that hybridizes a QUBO model with constraint programming (CP). Empirical results show that our LNS approach significantly outperforms classical CP-based LNS methods and a mixed integer programming model, while being competitive with CP for large problem instances. This work is the first approach that we are aware of that can solve non-trivial JSPs using QUBO hardware, albeit as part of a hybrid algorithm.
Efficient production planning is essential in modern manufacturing to improve performance indicators such as lead time and to reduce reliance on human intuition. While mathematical optimization approaches, formulated as job shop scheduling problems, have been applied to automate this process, solving large-scale production planning problems remains computationally demanding. Moreover, many practical scenarios involve conflicting objectives, making traditional scalarization techniques ineffective in finding diverse and useful Pareto-optimal solutions. To address these challenges, we developed a quantum-classical hybrid algorithm that decomposes the problem into two subproblems: resource allocation and task scheduling. Resource allocation is formulated as a quadratic unconstrained binary optimization problem and solved using annealing-based methods that efficiently explore complex solutions. Task scheduling is modeled as a mixed-integer linear programming problem and solved using conventional solvers to satisfy detailed scheduling constraints. We validated the proposed method using benchmark instances based on foundry production scenarios. Experimental results demonstrate that our hybrid approach achieves superior solution quality and computational efficiency compared to traditional monolithic methods. This work offers a promising direction for high-speed, multi-objective scheduling in industrial applications.
The Job Shop Scheduling Problem (JSSP) has always been considered as one of the most complex and industry essential scheduling problems. Optimizing the makespan of a given schedule generally involves using dedicated algorithms, local search strategies, or metaheuristics. These approaches, however, heavily rely on classical computational power, which is bounded by the physical limits of microcontrollers and power issues. Inspired by the promising results achieved for Quantum Annealing (QA) based approaches to solve JSSP instances, we propose a new approach that uses gate-model quantum architecture as an alternative to QA. We find that we can make use of the time-indexed JSSP instance representation to build a cost Hamiltonian, which can be embedded into Quantum Approximate Optimization Algorithm (QAOA) to find an optimal solution to a basic JSSP instance. We demonstrate the use of QAOA to solve the JSSP, and we evaluate its efficiency and accuracy for this problem from experimental results, as there is an increased urgency to demonstrate the applicability of quantum optimization algorithms. We also find that optimal variational parameters form patterns that can facilitate computation in bigger quantum circuits. Additionally, we compare the obtained noiseless simulation results of gate-model quantum circuits demonstrating the relationship between two evaluation criteria - makespan and energy. Finally, we analyze and present the overall performance of our approach with the increasing deadline and simulated depth of QAOA circuits.
Quantum optimization which is the use of quantum computers and algorithms for solving complex optimization problems, is one of the topics in quantum computing with the highest potential. Two types of approaches are generally used to solve combinatorial optimization problems with quantum computers: exact methods such as the Grover’s search algorithm, and meta-heuristics such as the Quantum Annealing and the Quantum Approximate Optimization Algorithm (QAOA). Exact methods and variational methods like QAOA make use of universal gate-based quantum computers, such as the ones developed by the IBM company.Quantum annealing is designed for analogic quantum computers developed by D-Wave. Solving a combinatorial optimization problem with heuristics generally requires a transformation of the problem to a format suitable for the quantum computer. While some existing frameworks can cope with Constrained Quadratic Models (CQM), Quadratic Unconstrained Binary Optimization (QUBO) is the best option to map an optimization problem to a quantum computer or simulator. We consider in this paper the job shop scheduling problem.
Many modern manufacturing companies have evolved from a single production facility to a multi-factory production environment that must manage both regionally dispersed production orders and their multi-site production steps. The availability of a range of machines in different locations capable of performing the same operation and shipping times between factories have transformed planning systems from the classic Job Shop Scheduling Problem (JSSP) to the Distributed Flexible Job Shop Scheduling Problem (DFJSP). Consequently, the complexity of production planning has increased significantly. We employ Quantum Annealing (QA) to solve the DFJSP in our research. In addition to assigning production orders to production sites, production steps are also assigned to these sites. This requirement is based on a real use case of a wool textile manufacturing company. To investigate the applicability of this method to large problem instances, problems ranging from 50 variables up to 250 variables, the largest problem that could be embedded into a D-Wave quantum annealer Quantum Processing Unit (QPU), are formulated and solved. Special Attention is dedicated to determining the Lagrange parameters of the Quadratic Unconstrained Binary Optimization (QUBO) model and the QPU configuration parameters, as these factors can significantly impact solution quality. The obtained solutions are compared to solutions obtained by Simulated Annealing (SA), both in terms of solution quality and calculation time. The results demonstrate that QA has the potential to solve large problem instances specific to the industry.