Optimization of Preventative Maintenance Requests background cover

Optimization of Preventative Maintenance Requests

Optimize the timing of preventative maintenance requests to reduce costs and increase efficient operations

EDF

Hosted by

EDF

Fatma Chaouech
pipanther

1

Posted

Credit Calculation Error in Toy Example

Could you please explain how the credit costs were calculated in the Toy Example? I think there might be an error in the calculation, or the PMRQ credit system wasn't explained well: When PMRQ 1 credits PMRQ 2 and 4, the cost should be 0, but it's 5 in the Toy Example.

Order by:

RMTboy

1

Posted by RMTboy

If I understand well, the quantity to optimise is the credit CC obtained which is expressed as follows. If the number of PMRQ is NN then the total cost is
t=1Ti=1NcostiPMRQi,t×(1j=1Ncrediti,jPMRQj,t)\sum_{t=1}^T \sum_{i=1}^{N}cost_i PMRQ_{i,t}\times (1-\sum_{j=1}^{N} credit_{i,j}PMRQ_{j,t}) and the credit obtained is
t=1Ti=1Nj=1Ncosticrediti,jPMRQi,tPMRQj,t\sum_{t=1}^T \sum_{i=1}^{N}\sum_{j=1}^{N} cost_i credit_{i,j} PMRQ_{i,t} PMRQ_{j,t}
where PMRQi,jPMRQ_{i,j} is 1 is the maintenance of ii is done at time tt and 0 otherwise. The variable credit(i,j)credit(i,j) indicates whether the maintenance of PMRQ-i is free if we do the one of PMRQ-j.
I guess there is a small typo in the sentence "PMRQ 1 credit PMRQ 2 and 4 for a cost of 5 at period 5" where it should be a cost of 4 and not 5. We'll rewrite the description of the problem to make it a bit more friendly!

Want to join this discussion?

Join our community today and start discussing with our members by participating in exciting events, competitions, and challenges. Sign up now to engage with quantum experts!